Cost Efficiency
Expected utility savings of approximately 33% through consolidated systems and improved energy operations.
Student Housing Case Study
Servitas engaged Synergy Fiber as the single IT vendor to design, deploy, and operate converged services under a tight 16-month timeline for August 2017 move-in.
Park West required full IT convergence across a massive student housing footprint: 15 buildings over 47 acres with gigabit-class connectivity expectations to every resident unit. Delivery had to align with a firm 16-month construction window and a fixed August 2017 student move-in date.
Because this was a high-profile Texas A&M-affiliated development, ownership and operations teams required one accountable technology partner to remove cross-vendor handoffs and keep installation, testing, and turn-up on schedule.
Single-vendor responsibility made the timeline executable: Synergy handled data, WiFi, TV, surveillance, access control, and low-voltage cabling as one coordinated delivery.
The network stack combined Ruckus wireless, ICX switching, and Virtual SmartZone control to support high-density resident demand across indoor and outdoor spaces. The deployment supports up to 1,900 Mbps data rates while maintaining a seamless roaming experience.
Ruckus R610 and H510 access points
ICX stackable switching backbone
Virtual SmartZone wireless controller
Supports up to 1,900 Mbps data rates
Seamless indoor and outdoor roaming
Managed by Synergy's 24/7 support desk
Access control infrastructure centered on SALTO's ProAccess SPACE management and SVN data-on-card technology, enabling resilient credential operations across residences and shared spaces.
1,100+ electronic locks managed with SALTO ProAccess SPACE
SVN data-on-card technology for secure offline and online workflows
RFID key fobs and bracelets for resident credentials
Windshield stickers for garage entry workflows
SALTO 4200 Series door controllers
"We knew for a project this unique, SALTO was the only solution."
Norman Roe, CEO, Synergy Fiber
Expected utility savings of approximately 33% through consolidated systems and improved energy operations.
Reduced multi-vendor overhead and project complexity through one integrated deployment partner.
One point of contact for support, maintenance, and service lifecycle management.
All services delivered in time for August 2017 move-in after full pre-occupancy certification and testing.
"It is rare in this industry to find a true IT partner capable of handling all these integrations."
Trey Verbick, VP, Servitas
Partners & Vendors
We can map your property requirements, define an integrated rollout strategy, and provide one accountable team from design through support.